Boeing Will Suspend 737 Max Production: Thousands Of Jobs At Risk

 | Dec 17, 2019 03:21AM ET

Boeing (NYSE:BA) has over-promised and under-delivered on getting the 737 Max back in service. In Jan, it will suspend production.

The Boeing 737 Max was grounded by Trump on March 13 following fatal crashes in Indonesia and Ethiopia that claimed a combined 346 lives.

Boeing expected flights to resume in a couple of months, then by October, then December.

Boeing is the largest U.S. manufacturing exporter and one of the nation’s top private employers. The MAX is Boeing's best-selling plane.

On December 16, Boeing announced 737 Max Production Will Be Suspended in January.

“It would be hard to have any other single company stop the production of a single product and have it hit the economy as hard as this would,” said Luke Tilley, chief economist at investment-management firm Wilmington Trust. He estimated that stopping MAX production for one quarter would shave 0.3 of a percentage point from quarterly annualized GDP growth.

“It’s not catastrophic, but we don’t need anything more corrosive in manufacturing right now,” said Diane Swonk, chief economist at Grant Thornton LLP. “It erodes our ability to grow because it’s such a big-ticket item.”

Boeing had 4,545 MAX orders in backlog as of Nov. 30 and had been building the aircraft at a rate of 42 a month since April, according to the company. Most MAX suppliers had already cut output in line with that rate, which allowed some—such as engine maker CFM International, a joint venture between General Electric (NYSE:GE) Co. and Safran (PA:SAF) SA —to catch up from production bottlenecks that hobbled deliveries last year.

GE has said it expects the grounding to drain as much as $1.4 billion from its cash flow this year as its factories produce fewer engines for the aircraft and can’t get paid for them in full.

Supplier Impact

Boeing said it would shift workers to other planes and that layoffs would not be necessary.

However, suppliers complain that stopping machinery would be harder than lowering production, and that restarting assembly lines would be costly.

Canceled Flights

Carriers around the world have pared routes, paused expansion and canceled thousands of flights they had planned to operate with the grounded aircraft.

Southwest Airlines (NYSE:LUV) Co. and United Airlines Holdings Inc. aren’t planning to fly the MAX commercially until March. American Airlines (NASDAQ:AAL) Group Inc. has removed the MAX from its schedule until early April.

Get The News You Want
Read market moving news with a personalized feed of stocks you care about.
Get The App

Southwest last week said it reached an agreement with Boeing to address $830 million in lost operating income resulting from the grounding this year. The airline didn’t disclose the terms of that deal but said it would distribute $125 million to employees.

Boeing 737 Max Order Backlog and Deliveries